Solar photovoltaic client case study – BITCO

BITCO is one of the main transport and logistics terminals in the regional port of Barranquilla, Colombia.

Project context

In order to reduce its carbon footprint and promote greener management of transport/logistics activities, the Port of Baranquilla was looking to use a greener source of energy.
As part of its #SHIFTProduction offer, GreenYellow designed and developed a bespoke project: a rooftop photovoltaic solar plant.

As a result, the BITCO terminal will benefit from green, local and competitively-priced electricity to cover part of its energy needs.
It will also enable the port to reduce its carbon footprint, while reinforcing its position as an eco-responsible player on a regional scale.

Do you have similar challenges?

Project highlights

  • Accelerate the port of Barranquilla’s energy transition by implementing a tailor-made project for its BITCO terminal.
  • Using clean energy
  • Reinforce the position of this regional port as an eco-responsible player, with the aim of becoming the main logistics hub in the Colombian Caribbean
  • Decentralized green electricity generation
  • Self-consumption of green, local and competitively priced electricity
  • Project under construction
  • Lower energy costs
  • Predictable costs
  • Reducing carbon footprint
  • Long-term guaranteed energy
  • Type of contract: PPA | Rooftop
  • Number of sites: 1
  • Start of contract: 09/2023
  • Lenght of contrat: 10 years

Project key figures

2 MWp

installed capacity

3 GWh

Annual production

0%

client investment

Other Solar photovoltaic client case studies

Analysons ensemble
l’impact écologique et financier
de votre optimisation énergétique

Nos experts vous contacteront pour comprendre vos besoins et développer votre projet clé en main, 100% financés !