Solar photovoltaic client case study – GO! MALL

The GO! MALL hypermarket chain, present throughout Vietnam.

Project context

GO! MALL, is a subsidiary of Central Group, one of Thailand’s largest conglomerates. GreenYellow has invested in solar energy systems on 10 shopping malls with a total capacity of 9 MWp.

Do you have similar challenges? 

Project highlights

  • Managing and building on multiple sites
  • Exploiting unused areas for energy production
  • 100% self-consumption
  • 17,549 panels installed
  • 68,790 m² of panels installed
  • O&M
  • Reducing energy consumption
  • Reducing environmental impact
  • Continuous control
  • Type of contract: PPA | Roof
  • Number of sites: 10
  • Start of contract: 12/2020
  • Lenght of contract: 20 years

Project key figures

9 MWp

installed capacity

13 GWh

Annual production

9,423 tons

CO2 emissions avoided

Avoided carbon emissions equivalent to

47,115 trees

planted

Other Solar photovoltaic client case studies

Analysons ensemble
l’impact écologique et financier
de votre optimisation énergétique

Nos experts vous contacteront pour comprendre vos besoins et développer votre projet clé en main, 100% financés !