Solar photovoltaic client case study – Ha Nam Textile

Ha Nam Textile is one of Vietnam’s leading yarn manufacturers.

Project context

Aware that the sparing use of energy is a matter of survival, Ha Nam Textile Co. has recently been looking for synchronous solutions to save electricity, including solar energy solutions. The switch to solar energy not only enables the company to reduce production costs, lower product prices and improve competitiveness, but also contributes to the sustainable development goals of the textile and clothing industry.

Do you have similar challenges? 

Project highlights

  • Mobilizing personnel and transporting materials to the construction site during the stressful Covid epidemic.
  • 100% self-consumption
  • 13,011 panels installed
  • 53,098 m² of panels installed
  • O&M
  • Reducing energy consumption
  • Reducing environmental impact
  • Continuous control
  • Type of contract: PPA | Roof
  • Number of sites: 1
  • Start of contract: 07/2021
  • Lenght of contract: 21 years

Project key figures

7 MWp

installed capacity

10.2 GWh

Annual production

7,350 tons

CO2 emissions avoided

0%

client investment

Avoided carbon emissions equivalent to

36,750 trees

planted

Other Solar photovoltaic client case studies

Let’s analyze together
the ecological and financial impact
of your energy optimization
Our experts will contact you to understand your needs
and develop your turnkey project, 100% financed!