Solar photovoltaic client case study – Saint-Dié des Vosges Hospital
The Saint-Dié des Vosges hospital is the referral facility for a hospital community serving 90,000 inhabitants.
Project context
Do you have similar challenges?
Saint-Dié des Vosges hospital center is committed to reducing its energy costs and ensuring a more sustainable supply of electricity.
As part of this project, GreenYellow installed nearly 3,000 Solar Carport panels to supply around 20% of the center’s energy consumption. An emblematic project for a public building that called on a third-party investor to accelerate its energy transition.
Project highlights
- Aligning with the energy transition goals of the hospital center
- Reduce CO2 emissions and gain autonomy of supply
- Leverage unused spaces
- 3,000 panels installed
- Self-consumption of production to cover more than 20% of needs
- Solar Carports deployed over 5,000m² in 3 parking lots
- Equivalent to powering 382 households
- Contribution to sustainable commitments
- Making the most of unusable space
- Protection of parked cars – Additional service for users
- Reducing CO2 emissions
- Type of contract: PPA | SOLAR CARPORT
- Number of sites: 1
- Start of contract: 06/2021
- Length of contract: 20 years
Project key figures
1,2 MWc
installed capacity
1,2GWh
Annual production
60 t
CO2 emissions avoided
0%
client investment
Avoided carbon emissions equivalent to
300 trees
planted
Share this article
Other Solar photovoltaic client case studies
- Solar energy production
- Solar energy production
- Solar energy production
Let’s measure together the impact of your energy transition actionson your competitiveness and environmental footprint, and explore the levers to decarbonize, electrify, and flexibilize your energy usage