SHIFTPRODUCTION

Solar photovoltaic case study – PTP IBÉRICA

PTP Group is a private logistics and port operator founded in 2010, with operations across Argentina, Brazil, Paraguay, Uruguay, Spain, and the Netherlands. The company specializes in multimodal transport, storage, and customs services along the Paraná–Paraguay waterway, supporting regional and international trade.

Project context

PTP Group had chosen GreenYellow to build a photovoltaic rooftop project on a newly constructed building, which includes Low Voltage works. 

Do you have similar challenges? 

Project highlights

  • New logistics warehouse combining refrigeration, insulated panels, shelving, pallet shuttle robots, photovoltaics, and voltage.
  • Ensuring seamless execution despite the complexity of managing multiple subcontractors
  • Roof designed from the start to integrate PV
  • Solar project developed alongside the building
  • Fewer procedures and shorter timelines through joint planning
  • Lower energy costs and reduced grid dependence

  • Use of the rooftop as a clean energy source

  • Progress in sustainability and CO₂ emissions reduction

  • TYPE OF CONTRACT: PPA | ROOFTOP
  • NUMBER OF SITES: 1
  • CONTRACT LENGTH: 15 years

Project key figures

1.1 MWp

installed capacity

2.4 GWh

Annual Production

0%

client investment

240 t

CO2 emissions avoided