Energy storage client case study – Accor Invest

Accor is a world-renowned hotel chain

Project context

Fast-charging stations require significant connection power, above the low-voltage limit, which can delay projects by several months. To support Accor Invest in its project to equip its parking lots with charging stations, GreenYellow decided to install a BESS to supply buffer power to speed up station deployment. The BESS can also be used to regulate supply in real time, providing maximum flexibility for the station and driving an optimized energy strategy.

Do you have similar challenges? 

Project highlights

  • Limit connection power
  • Speed up project deployment
  • Limiting the footprint of parking areas
  • Low-voltage ENEDIS connection with the battery as a power buffer
  • Design standardization with integrated products that will get back to international standards
  • Mature, proven technology with long-term performance guarantees
  • Vehicle recharging at the best price
  • Optimum charging speed and enhanced user experience
  • Resilience in the event of increased energy requirements via scalable stations
  • Type of contract: BESS + EVCS
  • Number of sites: 10
  • Start of contract: 06/2024
  • Length of contract: 10 years

Project key figures

2 MWh

total storage capacity

100 kWh/200kWh

batteries installed

0%

client investment