Solar photovoltaic client case study – OL GROUPAMA STADIUM
Committed to setting an example for its community, Lyon’s Groupama stadium has solarized part of the surface area available on its site.
Project context
In order to meet the targets set out in its “+20/-20 plan” (increasing energy production by 20% and drastically reducing consumption by 20%), the OL soccer group has gone all out by solarizing 50,000m² around its iconic stadium.
Thanks to this project, 80% of the stadium’s needs are covered by the production of photovoltaic panels, representing significant electricity savings.
Do you have similar challenges?
Project highlights
- As part of OL Groupe’s commitment to the “+20/-20 plan
- Diversifying energy sources
- Creating a photovoltaic park on a sports facility of a size unique in Europe
- 50,000 m² corresponding to 7 soccer pitches
- 4 emblematic areas: Groupama Stadium parking lot, Groupama OL Training Club self-consumption rooftops (1MWp), “All In Academy” rooftop, Arena rooftop
- Equivalent to powering 2,700 homes
- Contributing to the Group’s sustainable commitments
- Making the most of unusable space
- Improving visitor comfort
- Reducing CO2 emissions
- Type of contract: PPA | Roof & Solar Carports
- Number of sites: 1
- Start of contract: 08/2022
- Length of contract: 30 years
Project key figures
10 MWp
installed capacity
12 GWh
Annual production
2,000 t
CO2 emissions avoided
Avoided carbon emissions equivalent to
10,000 trees
planted
Share this article
Other Solar photovoltaic client case studies
Let’s analyze together
ecological and financial impact
of your energy optimization.
Our experts will contact you to understand your needs and develop your turnkey project, 100% financed!