Solar photovoltaic client case study – Extrafarma
Extrafarma is a pharmaceutical distribution and trading company in Brazil.
Project context
Extrafarma has called on GreenYellow to build a PV plant in Cedro (CE). The energy produced by this plant will supply 98% of the chain’s stores in the state with renewable energy.
Do you have similar challenges?
Project highlights
- Generate your own renewable energy without any initial investment
- PV plants – Decentralized power generation
- Grid injection
- Rental model
- +4,400 panels installed
- Equivalent to supplying 2,790 households
- Reduce energy costs through lower energy prices
- Predictable costs
- Reducing the carbon footprint
- Long-term guaranteed energy
- Type of contract: PPA | Ground-Mounted
- Number of sites: 1
- Start of contract: 2022
- Length of contract: 10 years
Project key figures
2,6 MWp
installed capacity
5.5 GWh
Annual production
252
CO2 emissions avoided
Avoided carbon emissions equivalent to
1 280 trees
planted
Share this article
Other Solar photovoltaic client case studies
- Solar energy production
- Solar energy production
- Solar energy production
- Solar energy production
- Solar energy production
Let’s measure together the impact of your energy transition actionson your competitiveness and environmental footprint, and explore the levers to decarbonize, electrify, and flexibilize your energy usage