Energy efficiency case study – Kim Alimentos

Kim Alimentos is a Brazilian food company specializing in the production of breads, cakes, cookies, wraps and savory snacks.

Project context

With 30 years’ experience behind it, Kim Alimentas, based in Carapicuíba (São Paulo metropolitan region), is expanding rapidly. As part of its development, it has chosen GreenYellow to address the energy efficiency challenges of its industrial processes.

Do you have similar challenges?

Project highlights

  • Accelerating Kim Alimentos’ energy transition
  • Optimizing energy consumption over the long term
  • Reduce energy costs over the long term
  1. Study and elaboration of the energy profile
  2. Identifying energy-saving opportunities
  3. Complete lighting redesign for the production area, adapting lighting levels to regulatory standards while ensuring employee comfort
  4. Monitoring by our Energy Managers to guarantee performance
  • Reducing energy costs by modernizing equipment
  • Optimized working conditions thanks to appropriate lighting
  • Reducing carbon footprint
  • Guaranteed performance for the duration of the contract
  • Type of contract: EPC (Energy Performance Contract)
  • Number of sites: 1 – production and administrative zones
  • Specificity of the project: 3 months of work, with no interruption to production, the company operates 7 days a week.
  • Start of contract: 03/2020
  • Length of contract: 5 years

Project key figures

150 MWh

saved over 12 months

-27%

on annual lighting consumption

14 tons

CO2 emissions avoided

+ R$ 40,000

saved

0%

client investment

Other Energy Efficiency client case studies

Let’s analyze together
ecological and financial impact
of your energy optimization.

Our experts will contact you to understand your needs and develop your turnkey project, 100% financed!