Energy Efficiency client case studies – MOUNTAIN AVOCADO
MOUNTAIN AVOCADO is a leading avocado producer in Colombia.
Project context
GreenYellow’s investment in a 130 TR refrigeration infrastructure has supported this producer specializing in the cultivation and production of avocados. GreenYellow’s experts installed a refrigeration system that meets the specific temperature and storage requirements of these products, guaranteeing compliance with all necessary standards.
Do you have similar challenges?
Project highlights
-
Improve your customer experience with greener refrigeration
-
Reduce the costs and environmental impact of the new plant
- GreenYellow specialized in-house engineering, experts in refrigeration, steam, compressed air, industrial services
- Lower operating and maintenance costs and reduced energy consumption
- No investment
- Warranty on installed equipment
- Continuous operation control
- Monthly and annual consumption reports
- Environmental contribution
- Type of contrat: UAAS | Industrial Refrigeration
- Number of sites: 1
- Start of contract: 02/2024
- Length of contract: 10 years
Project key figures
130 TR
installed capacity
0%
client investment
Share this article
Other Energy Efficiency client case studies
Together, let’s build your energy efficiency project