Energy Efficiency Client Case Study – Cedro Textil
Cedro Textil is one of Brazil’s leading textile companies
Project context
Cedro Textil replaced its compressed air system, switching from screw compressors to oil-free centrifugal compressors as part of an energy efficiency project.
The technical study revealed potential savings compared to the previous system, which did not use variable speed drives.
In addition to the savings achieved, this initiative reinforces the company’s commitment to reducing CO₂ emissions and industrial sustainability.
Do you have similar challenges?
Project highlights
- Old system with low efficiency
- High maintenance costs
- Installation of a centrifugal compressed air system, which is more efficient in terms of energy and maintenance
- Reduced energy consumption and costs
- Increased system reliability
- Reduction in production downtime
- Reduced maintenance costs
- Reducing CO2 emissions
- Type of contract : UAAS | Compressed air
- Number of sites: 1
- Start of contract : 01/2025
- Contract lenght : 5 years
Project key figures
2.18 GWh
Energy Savings
34%
savings compared to the previous system
84 tons
CO2 emissions avoided