Energy Efficiency Client Case Study – Stellantis España
The Stellantis Group is a multinational conglomerate that manufactures automobiles and provides mobility-related services.
Project context
The Stellantis plant in Madrid is a key production center for the company in Europe. Formerly known as the PSA plant in Villaverde, it is located in the Villaverde district, south of Madrid, Spain. As part of their decarbonization plans, they have entrusted us with three key pioneering initiatives: a photovoltaic power plant, a storage battery and heat pumps.
Do you have similar challenges?
Project highlights
-
Significantly reduce CO2 emissions generated by natural gas boilers
-
Ensure employee comfort and well-being within the factory
-
Replacement of natural gas boilers with heat pumps
-
Ensure effective air conditioning in workspaces within the factory
-
A pioneering three-part project by GreenYellow, aligned with the client’s emissions reduction targets
-
Demonstrates a strong commitment to energy transition and a substantial reduction in CO2 emissions
-
Supporting the transition to sustainable energy practices
- Type of contract: EPC | Heat pumps
- Number of sites: 1
- Start of contract: 12/2024
- Contract length: 15 years
Project key figures
2.9 GWh
Energy Savings
57%
savings compared to the previous system
1,218 tons
CO2 emissions avoided
Share this article
Other Energy Efficiency client case studies
Together, let’s build