Energy Efficiency Client Case Study – Stellantis España
Stellantis is a multinational conglomerate that manufactures automobiles and provides mobility-related services
Project context
The Stellantis plant in Madrid is a key production facility for the company in Europe. Formerly known as the PSA plant in Villaverde, it is located in the Villaverde district, south of Madrid, Spain. As part of their decarbonization efforts, they entrusted us with three key, pioneering initiatives: a solar power plant, a storage battery, and heat pumps.
Do you have similar challenges?
Project highlights
-
Significantly reduce CO2 emissions from natural gas boilers
-
Ensure the comfort and well-being of employees at the factory
-
Replacing natural gas boilers with heat pumps
-
Ensure effective air conditioning in the factory’s workspaces
-
A pioneering three-part project by GreenYellow that aligns with the client’s goals for reducing emissions
-
Demonstrates a strong commitment to the energy transition and a substantial reduction in CO2 emissions
-
Supporting the transition to sustainable energy practices
- Contract Type : EEA | Heat pump
- Number of sites: 1
- Start of contract : 12/2024
- Contract length:15 years
Project key figures
2.9 GWh
Energy savings
57%
savings compared to the previous system
1,218 tons
CO2 emissions avoided
Share this article
More client success stories on energy efficiency
- Energy Efficiency
- Energy Efficiency
- Energy Efficiency
- Energy Efficiency
- Energy Efficiency
- Energy Efficiency
Together, let’s build
your energy efficiency project